[DeTomaso] Pandora update

Christopher Kimball ChrisVKimball at msn.com
Thu Nov 30 17:36:40 EST 2017


Some of you have asked how Pandora is doing.  As  you might remember, a few years ago I sent her off to Oregon to Finn's Auto Restoration http://www.finnsautorestoration.com/.  Denny owns a Pantera and has worked on more than a few over the years.  He does great work, and as he began to examine my '72 pre-L (we named her Pandora), he began to find all the demons described in the famous "Pandora's Box" story from so long ago.  There was rust deep inside the car; far worse than anyone imagined.  We decided to begin to fix the problems.

Finns Auto Restoration - Home<http://www.finnsautorestoration.com/>
www.finnsautorestoration.com
Welcome to Finn's Restoration & Custom! This website is brand new, but we've been in the auto restoration and customizing business for over 25 years.




Little by little I've been sending checks, and when I asked about an update on what has been done recently, I received an email with the information below.  It's a pretty impressive list of what Denny and his team have done--but there is still a long way to go.  I hope that in the not-too-distant future Pandora will be back on the road.  When she is, I can tell by what's being done she'll be better than new!


Sincerely,


Chris


Take a look at this:



finish drilling, cutting and grinding away the left floor,



front inner rocker, A pillar bottom, and left front floor



inner brace. Strip and remove rust & undercoat from



the floor areas to be welded. Put the wheels on. Remove



from stands. Clean up the area. DAN(2.25hr)



strip the paint from the exterior of the left removed



1/4 panel. Strip paint and undercoat from back side of



the 1/4 panel in the location of where the new patch panel



will be spliced and TIG welded. Hammer and dolly flanges



around edge of 1/4 panel / inner apron panels. (still



weled together at this point). MOISES(4.5hr)






SHOP SUPPLIES: shop supplies used 1/1 thru 1/31



sandblast engine pieces. Timing cover, misc pieces.



JACOB(.4hr)



cleaned water pump, cleaned dist, cleaned harmonic



balencer, alternator, intake manifold, cleaned carb.



media blasted pulleys, mounting bracketry, dip stick tube,



timing cover plate, timing indicator. Cleaned lower idler



pulley mount. Installed timing cover. Installed intake



manifold. Masking for paint. Installed oil pan temp.



DAN M(9.5hr)



blow off engine parts. Wipe down. hang up and spray with



epoxy primer. Tape off area where the front seal would go.



clean oil pan w/ thinner & red scuff pad in prep for primer.



spray oil pan. Clean gun. MICHAEL(1hr)



MATERIALS PRIMER: Epoxy, hardener,reducer



installed oil pump w/ gasket. Torqued to spec. installed



oil pump drive shaft. Installed oil pan with gaskets.



DAN M.5hr)



Begin wheeling out the new left rocker panel. DAN(2hr)



Continue to english wheel the rocker. Layout the lower



tip line & tip. Brake over the upper outside line. Shrink



& stretch the rocker along the brake lines to get the



correct shape. DAN(5hr)



layout the top & bottom brake lines for the weld flanges.



pullmax the step into the top jamb area. Brake over the



weld flanges. Tip and stretch over the ends, then



straighten. Layout & cut away the jamb area for the pillar



& areas below the fender & 1/4 panel. DAN(4.5hr)



Make a profile of the bottom horizontal plane of the rocker



with drain locations. Continue to press, cut and weld the



drains into the new rockers. DAN (2.5 hrs)



Finish planishing the drian areas to bring the bottom weld



flange back into arrangement. DAN (1. hr)



Set pillar recess into the top of the rocker. Cut the ends



and "B" pillar area into the rocker tops. Begin to planish



the drian areas. DAN (1 hr)



SHOP SUPPLIES: shop supplies used 2/1 thru 2/29



Clean engine with wax & grease remover. Sandblast



pulleys and brackets. Scuff oil pan. Spray all parts and engine



with epoxy primer. Mix blue paint and spray engine. Mix



semi gloss black and spray pulleys, water neck.



MOISES(3.1hr)



MATERIALS PAINT: epoxy primer, blue paint, semi



gloss black.



install harmonic balancer, install water pump, 2 groove



crank pulley, 1 groove water pump pulley, A/C pump



bracket, upper idler pulley, lower idler pulley, oil PSI



sender, carb return spring plate. Move to TDC & install



dist & clamp. (need spark plugs & oil filter). Install water



pump belt, join A/C pump & alternator. Install A/c



& alternator belt, valve covers, thermostat, water neck.



cover exhaust ports. Install fuel pump. DAN M(6hr)



PARTS: Left A pillar / floor section from Larry's car.



drill apart & cut the left front A pillar, floor, rocker section



out of the donor front car section of Larry Finch. Prep



for install into the car. Jack up the front of the car.



remove the front left wheel. Begin to mock & trim for the



new A pillar loor chunk. Begin to remove seam sealer



& undercoat from donor part in prep for blasting. DAN



(7.5hr)



finish stripping off the undercoat & seam sealer from



the remove parts floor left A pillar chunk. Finish triming



off extra extra material. Weld & grind rust holes on the



parts piece. DAN(4.25hr)



SHOP SUPPLIES: shop supplies used 3/1 thru 3/31



PARTS: floor / rocker clip from Larry Finch.



Begin to fit & trim the new floor left A pillar bottom, rocker



inner assembly & floor braces. Shrink dents out of the



middle of the floor patch left. DAN(1.5hr)



Weld , grind & prime pinholes on the mid rocker



inside the bottom of the A pillar reinforcment. Fabricate



a patch for the A pillar bttom, then weld in, grind &



prime. Grind the remains of the old floor brace & welds



from the left floor. Fit & screw the new floor in place.



begin to trim A pillar area to fit. DAN(7hr)



finish fitting & trimming the left cowl / corner floor piece.



then weld in, grind & straighten. Begin to fabricate, fit,



& tack weld the inner rocker lf patch in place. DAN(12)



finish welding in, grinding & straightening the left inner



rocker patch. Fabricate a left floor patch outer mid area



to fill in between the orginal floor and the newly installed



front left floor section (used from Larry F). Then weld in



& grind & straighten. Fabricate the missing section of



the left inner floor brace. Epoxy prime the inside & the



area of the flooe that it covers. Fit, weld in & grind the



floor brace patch. DAN(11.5hr)



prep & apply epoxy primer to B pillar, rocker & 1/4



patch panels that Dan had fabricated. MOISES(1.75)



Fabricate a patch for the frnt left mid rocker section



under the A pillar. Then fit, weld in & grind. Trim, fit, weld



in & grind the left under floor brace patch to connect



the newly installed cowl floor brace. Fabricate a new



end for the under floor left cross brace floor support



that over laps the one the runs from the A pillar back



along the rocker. Then begin to fit & weld in place.



DAN(11.5hr)



Finsih trimming, fitting, welding in & grinding the new end



for the floor left crossbrace. Remove the left belly drip



pan mount. Then weld & grind 7 holes. Weld & grind



pin holes on the left floor. Clean up. Put the wheels



back on & take the car off the jack stands. DAN(3.5hr)



mask & prep for sandblasting of inside of left rocker and



other inner structure areas on the left side. GLEN(1hr)



SHOP SUPPLIES: shop supplies used 4/1 thru 4/30



Push car outside, sand blast as required, blow off car,



mask for epoxy primer. Mix up primer, spray blasted



areas as needed. GLEN (5.5 hrs)



SHOP SUPPLIES: shop supplies used 5/1 thru 5/31



Mask for fire protection. Begin to fabricate an end for



the rear left engine compartment upright. DAN (3.25 hrs)



Finish fabricating the end for the rear left engine



compartment upright end (3 pieces). Then fit, weld and



grind. Clean up inside then spray with epoxy primer. Fit



and weld on the front and rear mid rockers, then grind



and prime. DAN (9.5 hrs)



Begin to fit and trim the left "B" pillar sections, rocker



and door. DAN (8 hrs)



PARTS: hardware.



SHOP SUPPLIES: shop supplies used 6/1 thru 6/31



pattern & fabricate the left 1/4 window channel inner &



outer panels. Fit & weld in to the left 1/4 panel patch.



Then straighten. Begin to fit & move the roof up & the



1/4 & jamb panel. DAN(9 hrs)



Continue to fit the door, rocker, and 1/4 panel. Fit & trim



the 1/4 patch. Clean the undercoat from the weld zone.



then fully weld & planish the 1/4 patch panel into the



original 1/4 panel. DAN(10hr)



Finish straighten the front 1/4 left outer skin patch. Begin



to layout the patch for the inner 1/4 engine left panel.



DAN(2hr)



SHOP SUPPLIES: shop supplies used 7/1 thru 7/31



fit inner rail. Adjust support braces to fit frame rail.



welded frame rail together. Installed 1/4 panel. Fit 1/4



to original location. Made patch for inner 1/4 / wheel



house. Removed 1/4. TIG welded patch into place.



JOHN(6.3hr)



made patches for inner wheel well left. Fit, tacked,



welded patches in place. Ground & planish welds.



started making patch near tail light. Cleaned up welds













on 1/4 patch. Planish out weld. JOHN(10hr)















finished patch for inner wheel well near tail light. Fit,













tacked, welded patch. Ground & planish welds. Installed











1/4 panel & deck lid. Remove & re-install deck lid after









elongating holes on hinge to slide deck lid back. Adjusted








deck lid. JOHN(6hr)




























Adjusted door to get weather strip to seal by shutting a piece of paper between the door and the body. found weatherstrip was out of shape. Remove original mis-shapen weatherstrip, then test fit the new weatherstrip from Dennis car. checked seal on door jam, now it seals properly . (JOHN 2.75 hrs)












Went around door opening edge and shaped flange to make seal to drivers door. removed quarter, rocker panel, "b" pillar jam cover, "b" pillar cover interior and main support. Worked edge of main support to get rocker to move up at "b" pillar. installed "b" pillar  main support. Test fit rocker and checked door to rocker gap. Installed "b" pillar cover interior, "b" pillar jam cover and door striker. Made adjustments to striker and tested seal to door jam. JOHN (5 Hrs)












Installed drivers quarter panel structure, made it fit to door as best as possible. Removed quarter panel structure trimmed inner edge to move quarter in at rocker. Installed quarter panel structure checked fitment to rocker. Marked area to be removed on inner quarter panel structure. Removed quarter panel structure and trimmed edge. Trimmed edge on interior of engine compartment. Installed quarter panel structure then started tack welding inner structure into place. (JOHN 4.84 Hrs)












Tacked together more of inner quarter panel patch. (drivers side) (John .6 Hrs)












SHOP SUPPLIES:shop supplies used












Fit and welded inner wheel well. Cleaned up weld on inner wheel well. Made patch panel for rear part of inner wheel well. Trimmed to fit. Checked alignment to panel with straight edge. Cleaned up mess from working on car. JOHN (4 Hrs.)









-------------- next part --------------
   Some of you have asked how Pandora is doing.  As  you might remember, a
   few years ago I sent her off to Oregon to Finn's Auto
   Restoration [1]http://www.finnsautorestoration.com/.  Denny owns a
   Pantera and has worked on more than a few over the years.  He does
   great work, and as he began to examine my '72 pre-L (we named her
   Pandora), he began to find all the demons described in the famous
   "Pandora's Box" story from so long ago.  There was rust deep inside the
   car; far worse than anyone imagined.  We decided to begin to fix the
   problems.
   [2]Finns Auto Restoration - Home
   www.finnsautorestoration.com
   Welcome to Finn's Restoration & Custom! This website is brand new, but
   we've been in the auto restoration and customizing business for over 25
   years.

   Little by little I've been sending checks, and when I asked about an
   update on what has been done recently, I received an email with the
   information below.  It's a pretty impressive list of what Denny and his
   team have done--but there is still a long way to go.  I hope that in
   the not-too-distant future Pandora will be back on the road.  When she
   is, I can tell by what's being done she'll be better than new!

   Sincerely,

   Chris

   Take a look at this:

   finish drilling, cutting and grinding away the left floor,


   front inner rocker, A pillar bottom, and left front floor


   inner brace. Strip and remove rust & undercoat from


   the floor areas to be welded. Put the wheels on. Remove


   from stands. Clean up the area. DAN(2.25hr)


   strip the paint from the exterior of the left removed


   1/4 panel. Strip paint and undercoat from back side of


   the 1/4 panel in the location of where the new patch panel


   will be spliced and TIG welded. Hammer and dolly flanges


   around edge of 1/4 panel / inner apron panels. (still


   weled together at this point). MOISES(4.5hr)



   SHOP SUPPLIES: shop supplies used 1/1 thru 1/31


   sandblast engine pieces. Timing cover, misc pieces.


   JACOB(.4hr)


   cleaned water pump, cleaned dist, cleaned harmonic


   balencer, alternator, intake manifold, cleaned carb.


   media blasted pulleys, mounting bracketry, dip stick tube,


   timing cover plate, timing indicator. Cleaned lower idler


   pulley mount. Installed timing cover. Installed intake


   manifold. Masking for paint. Installed oil pan temp.


   DAN M(9.5hr)


   blow off engine parts. Wipe down. hang up and spray with


   epoxy primer. Tape off area where the front seal would go.


   clean oil pan w/ thinner & red scuff pad in prep for primer.


   spray oil pan. Clean gun. MICHAEL(1hr)


   MATERIALS PRIMER: Epoxy, hardener,reducer


   installed oil pump w/ gasket. Torqued to spec. installed


   oil pump drive shaft. Installed oil pan with gaskets.


   DAN M.5hr)


   Begin wheeling out the new left rocker panel. DAN(2hr)


   Continue to english wheel the rocker. Layout the lower


   tip line & tip. Brake over the upper outside line. Shrink


   & stretch the rocker along the brake lines to get the


   correct shape. DAN(5hr)


   layout the top & bottom brake lines for the weld flanges.


   pullmax the step into the top jamb area. Brake over the


   weld flanges. Tip and stretch over the ends, then


   straighten. Layout & cut away the jamb area for the pillar


   & areas below the fender & 1/4 panel. DAN(4.5hr)


   Make a profile of the bottom horizontal plane of the rocker


   with drain locations. Continue to press, cut and weld the


   drains into the new rockers. DAN (2.5 hrs)


   Finish planishing the drian areas to bring the bottom weld


   flange back into arrangement. DAN (1. hr)


   Set pillar recess into the top of the rocker. Cut the ends


   and "B" pillar area into the rocker tops. Begin to planish


   the drian areas. DAN (1 hr)


   SHOP SUPPLIES: shop supplies used 2/1 thru 2/29


   Clean engine with wax & grease remover. Sandblast


   pulleys and brackets. Scuff oil pan. Spray all parts and engine


   with epoxy primer. Mix blue paint and spray engine. Mix


   semi gloss black and spray pulleys, water neck.


   MOISES(3.1hr)


   MATERIALS PAINT: epoxy primer, blue paint, semi


   gloss black.


   install harmonic balancer, install water pump, 2 groove


   crank pulley, 1 groove water pump pulley, A/C pump


   bracket, upper idler pulley, lower idler pulley, oil PSI


   sender, carb return spring plate. Move to TDC & install


   dist & clamp. (need spark plugs & oil filter). Install water


   pump belt, join A/C pump & alternator. Install A/c


   & alternator belt, valve covers, thermostat, water neck.


   cover exhaust ports. Install fuel pump. DAN M(6hr)


   PARTS: Left A pillar / floor section from Larry's car.


   drill apart & cut the left front A pillar, floor, rocker section


   out of the donor front car section of Larry Finch. Prep


   for install into the car. Jack up the front of the car.


   remove the front left wheel. Begin to mock & trim for the


   new A pillar loor chunk. Begin to remove seam sealer


   & undercoat from donor part in prep for blasting. DAN


   (7.5hr)


   finish stripping off the undercoat & seam sealer from


   the remove parts floor left A pillar chunk. Finish triming


   off extra extra material. Weld & grind rust holes on the


   parts piece. DAN(4.25hr)


   SHOP SUPPLIES: shop supplies used 3/1 thru 3/31


   PARTS: floor / rocker clip from Larry Finch.


   Begin to fit & trim the new floor left A pillar bottom, rocker


   inner assembly & floor braces. Shrink dents out of the


   middle of the floor patch left. DAN(1.5hr)


   Weld , grind & prime pinholes on the mid rocker


   inside the bottom of the A pillar reinforcment. Fabricate


   a patch for the A pillar bttom, then weld in, grind &


   prime. Grind the remains of the old floor brace & welds


   from the left floor. Fit & screw the new floor in place.


   begin to trim A pillar area to fit. DAN(7hr)


   finish fitting & trimming the left cowl / corner floor piece.


   then weld in, grind & straighten. Begin to fabricate, fit,


   & tack weld the inner rocker lf patch in place. DAN(12)


   finish welding in, grinding & straightening the left inner


   rocker patch. Fabricate a left floor patch outer mid area


   to fill in between the orginal floor and the newly installed


   front left floor section (used from Larry F). Then weld in


   & grind & straighten. Fabricate the missing section of


   the left inner floor brace. Epoxy prime the inside & the


   area of the flooe that it covers. Fit, weld in & grind the


   floor brace patch. DAN(11.5hr)


   prep & apply epoxy primer to B pillar, rocker & 1/4


   patch panels that Dan had fabricated. MOISES(1.75)


   Fabricate a patch for the frnt left mid rocker section


   under the A pillar. Then fit, weld in & grind. Trim, fit, weld


   in & grind the left under floor brace patch to connect


   the newly installed cowl floor brace. Fabricate a new


   end for the under floor left cross brace floor support


   that over laps the one the runs from the A pillar back


   along the rocker. Then begin to fit & weld in place.


   DAN(11.5hr)


   Finsih trimming, fitting, welding in & grinding the new end


   for the floor left crossbrace. Remove the left belly drip


   pan mount. Then weld & grind 7 holes. Weld & grind


   pin holes on the left floor. Clean up. Put the wheels


   back on & take the car off the jack stands. DAN(3.5hr)


   mask & prep for sandblasting of inside of left rocker and


   other inner structure areas on the left side. GLEN(1hr)


   SHOP SUPPLIES: shop supplies used 4/1 thru 4/30


   Push car outside, sand blast as required, blow off car,


   mask for epoxy primer. Mix up primer, spray blasted


   areas as needed. GLEN (5.5 hrs)


   SHOP SUPPLIES: shop supplies used 5/1 thru 5/31


   Mask for fire protection. Begin to fabricate an end for


   the rear left engine compartment upright. DAN (3.25 hrs)


   Finish fabricating the end for the rear left engine


   compartment upright end (3 pieces). Then fit, weld and


   grind. Clean up inside then spray with epoxy primer. Fit


   and weld on the front and rear mid rockers, then grind


   and prime. DAN (9.5 hrs)


   Begin to fit and trim the left "B" pillar sections, rocker


   and door. DAN (8 hrs)


   PARTS: hardware.


   SHOP SUPPLIES: shop supplies used 6/1 thru 6/31


   pattern & fabricate the left 1/4 window channel inner &


   outer panels. Fit & weld in to the left 1/4 panel patch.


   Then straighten. Begin to fit & move the roof up & the


   1/4 & jamb panel. DAN(9 hrs)


   Continue to fit the door, rocker, and 1/4 panel. Fit & trim


   the 1/4 patch. Clean the undercoat from the weld zone.


   then fully weld & planish the 1/4 patch panel into the


   original 1/4 panel. DAN(10hr)


   Finish straighten the front 1/4 left outer skin patch. Begin


   to layout the patch for the inner 1/4 engine left panel.


   DAN(2hr)


   SHOP SUPPLIES: shop supplies used 7/1 thru 7/31


   fit inner rail. Adjust support braces to fit frame rail.


   welded frame rail together. Installed 1/4 panel. Fit 1/4


   to original location. Made patch for inner 1/4 / wheel


   house. Removed 1/4. TIG welded patch into place.


   JOHN(6.3hr)


   made patches for inner wheel well left. Fit, tacked,


   welded patches in place. Ground & planish welds.


   started making patch near tail light. Cleaned up welds







   on 1/4 patch. Planish out weld. JOHN(10hr)








   finished patch for inner wheel well near tail light. Fit,







   tacked, welded patch. Ground & planish welds. Installed






   1/4 panel & deck lid. Remove & re-install deck lid after





   elongating holes on hinge to slide deck lid back. Adjusted




   deck lid. JOHN(6hr)














   Adjusted door to get weather strip to seal by shutting a piece of paper
   between the door and the body. found weatherstrip was out of shape.
   Remove original mis-shapen weatherstrip, then test fit the new
   weatherstrip from Dennis car. checked seal on door jam, now it seals
   properly . (JOHN 2.75 hrs)






   Went around door opening edge and shaped flange to make seal to drivers
   door. removed quarter, rocker panel, "b" pillar jam cover, "b" pillar
   cover interior and main support. Worked edge of main support to get
   rocker to move up at "b" pillar. installed "b" pillar  main support.
   Test fit rocker and checked door to rocker gap. Installed "b" pillar
   cover interior, "b" pillar jam cover and door striker. Made adjustments
   to striker and tested seal to door jam. JOHN (5 Hrs)






   Installed drivers quarter panel structure, made it fit to door as best
   as possible. Removed quarter panel structure trimmed inner edge to move
   quarter in at rocker. Installed quarter panel structure checked fitment
   to rocker. Marked area to be removed on inner quarter panel structure.
   Removed quarter panel structure and trimmed edge. Trimmed edge on
   interior of engine compartment. Installed quarter panel structure then
   started tack welding inner structure into place. (JOHN 4.84 Hrs)






   Tacked together more of inner quarter panel patch. (drivers side) (John
   .6 Hrs)






   SHOP SUPPLIES:shop supplies used






   Fit and welded inner wheel well. Cleaned up weld on inner wheel well.
   Made patch panel for rear part of inner wheel well. Trimmed to fit.
   Checked alignment to panel with straight edge. Cleaned up mess from
   working on car. JOHN (4 Hrs.)

References

   1. http://www.finnsautorestoration.com/
   2. http://www.finnsautorestoration.com/


More information about the DeTomaso mailing list