[DeTomaso] Track Boss Cleveland block Update...The day we have been waiting for.

G Mail fordmachinist at gmail.com
Tue Apr 19 22:34:42 EDT 2016


4/19/2016 Track Boss update...Part II
The Boss is Back!!
We also took delivery of (2) TB9.2ALB (Track Boss Cleveland block 9.2" deck height) It is wonderful to finally have my hands on "our" block now. 
Again, I want to thank Tod Buttermore for the original design of this block. We will retain the original look of a Cleveland block. But the insides are something else.
We have added extra material to make the mains solid. We have also added extra material for the 1-piece rear main seal. Even for those drag race guys, we have extra material for an option of mounting a Chevy starter. There will still be some tweaking to do yet, but we have a great start. The first block will be our "guinea pig" Once we have done all of the machining, it will be sliced up and inspected for proper machining locations.
We have a 3-4 extra features that we will be sharing down the road, so share with your friends and other web site and stay tuned. In the words of David Weiss, (President of R&D at Eck Industries, our foundry) "This will be the strongest block on the market"

You can follow this link and we have about a dozen pictures of the block.
http://www.tmeyerinc.com/product-p/tb9.2.htm

Tim Meyer

Sent from my iPad
-------------- next part --------------
   4/19/2016 Track Boss update...Part II
   The Boss is Back!!
   We also took delivery of (2) TB9.2ALB (Track Boss Cleveland block 9.2"
   deck height) It is wonderful to finally have my hands on "our" block
   now.

   Again, I want to thank Tod Buttermore for the original design of this
   block. We will retain the original look of a Cleveland block. But the
   insides are something else.

   We have added extra material to make the mains solid. We have also
   added extra material for the 1-piece rear main seal. Even for those
   drag race guys, we have extra material for an option of mounting a
   Chevy starter. There will still be some tweaking to do yet, but we have
   a great start. The first block will be our "guinea pig" Once we have
   done all of the machining, it will be sliced up and inspected for
   proper machining locations.

   We have a 3-4 extra features that we will be sharing down the road, so
   share with your friends and other web site and stay tuned. In the words
   of David Weiss, (President of R&D at Eck Industries, our foundry) "This
   will be the strongest block on the market"

   You can follow this link and we have about a dozen pictures of the
   block.

   [1]http://www.tmeyerinc.com/product-p/tb9.2.htm

   Tim Meyer
   Sent from my iPad

References

   1. http://www.tmeyerinc.com/product-p/tb9.2.htm


More information about the DeTomaso mailing list